The project owner wants progress reports. The insurer asks for documentation. And you want to keep an overview of a site that changes every week. Construction site monitoring with a drone provides an objective view of the entire site at fixed intervals.
What it is
A drone flies over the site at fixed intervals: weekly, every two weeks or monthly. Each flight delivers the same set of outputs:
- Orthophoto: a georeferenced image of the entire site to scale
- Progress images: taken from the same angles, so you can compare measurement moments side by side
- Elevation model and volumes: optional, to calculate earthworks and stockpiles
What determines the effort
Four factors: the size of the site, the frequency, the type of output and the airspace. A site in a controlled zone around an airport requires a permission for each flight, with a fixed application period. A site in open airspace does not.
A series of measurement moments agreed in advance as a whole requires less effort per capture than individual flights. The flight plan, control points and airspace file are set up once and reused. That is why we preferably propose construction site monitoring as a series with a fixed schedule.
What it delivers
- Objective progress reporting. One orthophoto shows more than ten pages of text. The project owner sees the status without visiting the site.
- Early insight into deviations. Material in the wrong place or a phase that is falling behind is noticed before it becomes a problem.
- A timeline. After completion you have a full image archive of the construction process, usable for warranty files and disputes.
- Accurate volumes. Earthworks and stockpiles are calculated instead of estimated, which helps with correct invoicing.
When it pays for itself
Not through the price per flight, but through what one avoided dispute or one correctly calculated volume is worth. A claim for additional work that you refute in a quarter of an hour with a dated orthophoto. An earthworks settlement that is correct without a re-measurement. A project manager who no longer spends half a day every week taking photos. The longer the site runs and the more parties are involved, the sooner that point is reached.
For which sites
Sites with a duration of at least four to six weeks, and sites where an aerial view shows more than a walk-through on the ground: large plots, linear infrastructure, earthworks and structural work.
FAQ
Can I use the data in my own software?
Yes. We deliver PDF reports, orthophotos in GeoTIFF and point clouds in formats that most GIS and CAD software can open, in your coordinate system.
How long does a flight on the site take?
Depending on the size, usually 15 to 45 minutes. The disruption to the works remains limited.
For this service: Construction site monitoring on the Surveying page